T. A. Harrison
Formwork striking times
Mechanical damage to concrete by early removal of formwork
Cement combinations for durable concrete
Concrete floors and slabs
Dr. Tiberius' Old Fashioned Deviant Sex Manual
Formwork striking times-methods of assessment
Permanent GRC soffit formwork for bridges
Pressure on vertical formwork when concrete is placed in wide sections
Tables of minimum striking times for soffit and vertical formwork
The application of accelerated curing to apartment formwork systems
The properties and use of concretes made with composite cements