Gt. Britain. National Coal Board.
A.B. Longwall Trepanner
Armstrong Airbreaker at Bank Hall Colliery
C.E.E. Dust-Suppression Jib
Climax S.W.2B Water-Controlled Pick
Construction in Reinforced Concrete at A Dutch Colliery
Design of Fan Drifts
Dosco Miner
Drilling Methane Drainage Boreholes in Hard Strata with the Nusse and Grafer P.4/6 Machine
Dust Suppression on Anderton Shearer Loaders
Experience in Compressed-Air Blasting
Filling A Roof Cavity at A Roadhead
Firedamp Drainage Trials with Cross-Measure Boreholes